Teratec Construction Report: Nursing Care Facility
Ensuring the safety of event halls where elderly people gather! Introducing examples of floor sinking correction work.
We would like to introduce a case where the issues of subsidence and voids at a nursing care facility were resolved using the Teratec method. 【Issues】 At a nursing care facility in Aomori Prefecture, built 14 years ago, the floor of the event hall where elderly individuals gather had sagged significantly, causing the doors to not close properly. 【Reason for Choosing Teratec】 The work can be completed in one day, minimizing the burden on the residents. 【Feedback After Construction】 The construction was completed in one day, and except for areas where the flooring had developed a warp due to long-term subsidence, we were able to raise the height to ±0. 【Case Overview】 ■ Nursing Care Facility - Construction Details: Floor subsidence correction work - Construction Date: October 2014 - Location: Aomori Prefecture - Construction Area: Total 65m² - Step Correction: 30mm *For more details, please refer to the external link page or feel free to contact us. Toll-Free Number: 0120-873-835
- Company:メインマーク 【全国対応】/東京・大阪・札幌・仙台・新潟・金沢・名古屋・福岡
- Price:Other